The raised operation on the heap
The operation of tailing processing is raised so that hammer crusher is placed on the top of the heap and sluices down. The second sluice have too much of the slope and also very turbulent water flow that simply looses a lot of gold. 1-2 grams of gold lost per day makes a lot of money on the end of the month.
