Excavating soft ores for processing on the wash plant, recovering gold
Excavating soft ores with such an excavator is quite easy. The capacity of the excavator is about 500 tonnes of soft ores per day. It goes fast. The capacity of the wash plant for gold concentration is about 80 tonnes per SYOGM™ Gold Recovery Plant. Multiple plants can be assembled together to handle the full capacity that excavator may mine per one working day. For more information: https://www.startyourowngoldmine.com