Preliminary Site Assessment and Inspection to Start Your Own Gold Mine


Preliminary Site Assessment and Inspection

Before important decisions can be made in relation to a mining site, our company is conducting a Preliminary Site Assessment and Inspection project that has the purpose to diligently assess and analyze the life and business resources available on the mining site in order to understand what is needed and wanted for living and mining activities in the future, as also the previous gold mining history.

Most important is to determine the existence of profitable gold bearing ores.

SAM_0005.JPG SAM_0010.JPG SAM_0014.JPG SAM_0022.JPG SAM_0058.JPG SAM_0068.JPG

Following information is gathered and assessed in relation to the mining site:

  1. The legality of the license, current situation in relation to the license, the ownership of the land, and any other legal issues;

  2. Upon arrival to the mining site, we are making sure to have immediately the living resources for our team members, such as food, and when necessary accommodation, and some tools.

  3. We are determining exact location of the mining land, we may use the GPS and verify the corners of the mining land. We are also to determine if any previous excavations and resources are located on the mining site or outside of the boundaries of the mining site.

  4. We are searching for possible water sources for mining and living purposes. Water being most important factor for recovery of gold has the priorities. We may find solutions to bring water to the mining site or to tranport eventually ores to other places where it may be processed with purpose of recovery of gold.

  5. Then we are reviewing the operational history and we verify any available access to ores and availability of gold in soil or in rocks.

  6. We are also reviewing the living resources such as drinking water, availability of food and similar.

  7. We review the communication resources on the mining site, radio call, the mobile networks.

  8. We review all available business resources, the gold recovery plants, equipment, quality of gold, and any other business resources.

  9. We assess the safety on the mining site.

  10. We assess the nearest village or town in relation to its development, and what resources may it offer to us, such as technicians, hospital, food, timber, and similar.

  11. We assess the possible mercury pollution on mining site and around.

  12. We assess the possibilities for the accommodation for future activities on same mining sites.

  13. We may inform the mining site holder about our findings and preliminary conclusions.

  14. We analyze the information gathered and finalize the report which is usually done at our headquarters, and once done, we make conclusions and recommendations for the next step of the mining site development.

The mining site holder or principal or individual with power of attorney for the mining site holder, is to approve these actions relating to the mining site, in writing.

Profitable Gold Bearing Ores

In mining terminology it is enough to say “ores” as that alone would mean that ores are profitable.

As we often deal with businessmen rather than with mining engineers, we stress the fact that most important substance in gold mining is gold bearing ores, as that is why we are mining it.

Preliminary Site Inspection and Assessment determines if profitable gold bearing ores are now on the site, or there are some serious indications about it.

Indication is not an occurence of gold. Indication is not having few grams of gold produced every day.

Indication of profitable gold bearing ores could be when there are 200 shafts among which 80 shafts are profitable and where site inspection gives indication of the underground reef, its heights, widths, lengths and directions.

Pictures from past Preliminary Site Assessment and Inspection projects on mining lands

SAM_0174.JPG SAM_0183.JPG SAM_0203.jpg SAM_0232.JPG SAM_0234-1536.jpg SAM_0234-crop.JPG IMG_20170105_105501179_HDR.jpg IMG_20170105_112304406.jpg IMG_20170105_112436125.jpg IMG_20170105_124859341.jpg IMG_20170105_124929574.jpg IMG_20170105_130617488.jpg IMG_20170105_130620681.jpg IMG_20170105_134111237.jpg SAM_0098.JPG SAM_0100.JPG SAM_0101.JPG SAM_0102.JPG SAM_0105.JPG SAM_0118.JPG SAM_0120.JPG SAM_0123.JPG SAM_0127.JPG SAM_0132.JPG SAM_0133.JPG SAM_0137.JPG SAM_0139.JPG SAM_0140.JPG SAM_0144.JPG SAM_0147.JPG SAM_0151.JPG SAM_0165.JPG SAM_0171.JPG 2017-01-07-19:18:33.jpg



The London or gold world market price as of Monday, April 13 2026, 18:02:51 was US $153.20 per gram or US $153200.88 per kilogram.

SYOGM Advance Gold Wash Plant Design

SYOGM Advance Gold Wash Plant Design

The SYOGM Advance Wash Plant is an innovative gold recovery system designed for efficient extraction of gold particles from dirt and alluvial deposits. It incorporates components like excavators, wash hoppers, grizzly bars, screen units, sluices, and a concentrate room to optimize the washing process and maximize gold recovery. The plant allows miners to extract gold effectively at various scales while minimizing effort and resources. Its design includes advanced technology for fine gold extraction using Cleangold inserts and ensures secure storage of concentrates through a monitored concentrate room.

What is a Mining Engineer? A Guide to Becoming One.

What is a Mining Engineer? A Guide to Becoming One.

A Mining Engineer is a specialized professional responsible for the discovery, extraction, and processing of mineral resources. These engineers play a crucial role in the mining industry, ensuring that the extraction processes are efficient, safe, and environmentally sustainable. They are involved in planning, designing, and overseeing mining operations, as well as in the management of mineral resources. Mining Engineers often collaborate with geologists, metallurgists, and other professionals to develop and implement mining strategies. Their work is essential for the supply of raw materials used in various industries, including construction, manufacturing, and energy.

Contact us to Start Your Own Gold Mine

Contact us to Start Your Own Gold Mine. There is a simple rule at Start Your Own Gold Mine: if we can help you, we do, whenever and wherever necessary, and it's the way we've been doing business since 2002, and the only way we know

Contact Mr. Jean Louis by Telegram icon Telegram at username @rcdrun or by WhatsApp icon WhatsApp Business. Or call Mr. Louis at +256706271008 in Uganda or send SMS to +256706271008


Full name:


E-mail:


Phone:


Message:


 

💬 Support Chat