SYOGM GOLD EXPLORATION

Exploration & Mining Solutions

Location Butanaziba Business Center, Kyebando Central, Kampala, Uganda
Phone +256 706 271 008
Address Butanaziba Business Center, Kyebando Ring Road
Kyebando Central, Kampala, UGANDA

Professional Mining Solutions & Full Program Details

Welcome to the official quotation for the Start Your Own Gold Mine (SYOGM) Full Program. This comprehensive, mentor-guided program is designed to help aspiring entrepreneurs establish their own profitable gold mining operations in Africa within 45 days.

The Full Start Your Own Gold Mine Program costs US $66,000. It provides a complete solution including essential mining machinery, training, consulting, and legal setup (mining license) to ensure you can start production immediately.

Program Overview: We provide the equipment necessary to process up to 5 tonnes of hard rock per hour and 80 tonnes of soft ore per day. The program includes full training, mentorship, and access to a pool of thousands of skilled workers.

To:

Mahamadou Diaby

Mali

+223 72 35 32 99

Program Items

Quotation Details

Full Start Your Own Gold Mine Program

$66,000.00
  • Comprehensive Turnkey Solution

    Establish a viable gold mining operation with full ownership and no profit-sharing requirements.

    • No Gold Sharing: Clients retain 100% of all gold produced.
    • Full Equipment: Includes Rock Impact Mill, Jaw Crusher, and Wash Plant.
    • Legal Setup: Mining licenses and company registration assistance provided.
    • Full Training: Become competent in managing, organizing, and maintaining operations.
    • Privileged Benefit: Access to equipment worth over US $60,000.

Payment Plan for Full Program (US $66,000)

Phase 1
Agreement

Sign & Start

US $15,000

Payment upon signing the agreement to initiate the setup process and secure the program slot.

Phase 2
Setup

Initial Delivery

US $6,000

Payment for the shipping and logistics of the first batch of equipment to the site.

Phase 3
Training

On-Site Training

US $6,000

Payment for the comprehensive on-site training and mentorship sessions before full operation.

Phase 4
Training

Testing Phase

US $6,000

Final payment required before the testing and training phase in Uganda commences.

Payment Structure & Equipment Delivery

Equipment Delivery is contingent upon the final payment. The customer covers all expenses related to transport, accommodation, and logistics for the training and testing phases in Uganda.

Total Paid Before Testing $33,000
Balance Required $33,000
Testing Location Uganda

Comprehensive Equipment Package

Rock & Ore Comminution System

The core of the operation features heavy-duty machinery designed for high-volume processing. The SYOGM Rothensteed Rock Impact Mill and Jaw Crusher form a powerful primary crushing line capable of breaking down hard rock, ore, and abrasive substances directly at the site.

  • Power: 10 HP to 20 HP (Petrol Engine or Blue Electric Motor).
  • Capacity: 1000 kg per hour (Double the capacity of standard mills).
  • Material: High-carbon spring steel hammers for durability.
  • Operation: Continuous, water-assisted grinding for optimal recovery.
Full Alluvial Wash Plant System

This is not just a set of parts; it is a fully integrated, mobile processing plant. We have assembled a complete fine gold recovery system that works seamlessly with the commutation units to maximize yield.

The system utilizes advanced vortex matting and specialized riffles to trap gold particles as small as 5 microns. It is designed to handle both soft alluvial deposits and the crushed rock from the milling process, ensuring zero mercury contamination and maximum environmental safety.

  • Efficiency: 5x more efficient than traditional artisanal methods.
  • Recovery: Captures particles as small as 5 microns.
  • Technology: Vortex micro-mats and multi-stage gravity separation.
  • Environment: Zero-mercury, zero-cyanide solution.
  • Superior Recovery: Recovers 20% more gold than standard mercury-based methods.
Full Maintenance & Mentorship

We do not just sell equipment; we ensure your operation runs efficiently. Our program provides full mentorship on equipment maintenance, including routine checks, troubleshooting, and repair strategies to minimize downtime. Our experts train your staff to handle the machinery safely and effectively, ensuring longevity and maximum output from day one.

System Gallery (Click to Enlarge)

Total Program Cost

$66,000.00

Includes full equipment package, maintenance mentorship, legal setup, and expert training.

Start Your Own Gold Mine

www.StartYourOwnGoldMine.com

"The SYOGM system is five times more efficient than traditional methods, ensuring high overall recovery rates (up to 98%) and sustainable operations."

Value Proposition: The equipment included in this program is equivalent to a full industrial wash plant in the USA, which typically costs between $200,000 and $400,000.

%s